Today being a day off from my day job, I worked just as hard and got a lot done! Let's see, a quick list:
- Bought metal scraps for the chassis at the local ag/industrial supply, which is a toy store for a hot rod builder!
- Ordered from a Ford parts warehouse my F1 front brake drums, and one '46 style bonded rear brake shoe to go with the other three good ones I have
- Picked up my '39 pedal assembly-to-Pinto/Mustang master cylinder adaptor at the local street rod shop
- Bought materials at the local hardware shop to plug my uncle's MIG into my 220v outlet
- Sold my defunct boat (but was gonna be a utility) trailer to my neighbor, thereby freeing up room on the side of the house
- Used said neighbor to move the Model A roadster pickup (RPU from here on out) project (did I mention I have a 2nd hot rod project? Yeah, it'll be the later, pretty one) outta the garage and onto the deck to give me some wiggle room in the garage
- Made some more room on the garage floor to work
- Disassembled and reassembled the front end assemblies, in preparation for tomorrow's wishbone work
- Sat in the T after it was all said and done, reflecting on the work I got done, and my tired muscles (I didn't begin to describe to you all of the "regular" errands I also ran today!)
-30-
Friday, August 1, 2008
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment